- Take down ceramic towel bar, patch resulting holes in drywall
- Take down wall paper, paint walls new color
- Take down built in shelf, put in a linen cabinet in its place
- Scrape off popcorn ceiling, paint.
- Replace mirror with framed mirror
- Refinish vanity (not completed yet)
Being such a small space, it's difficult to get a good picture, so you'll have to come over to really experience it. I'm still adding some finishing touches, and I'd like to still redo that vanity, but I wanted to show off how it looks so far.
Before
After
Before
After
1 comment:
Much improved!
Post a Comment